We treat Structural Rebuild as a construction project with a real schedule, not an open-ended timeline that drags on.
📞 Call +1-866-484-1409 Now
Full GC oversight, not subcontracted piecemeal.
Inspections built into the schedule, not an afterthought.
Change orders require your written approval.
A defined timeline with milestones, not open-ended.

Load-bearing walls rebuilt to current Vado, NM code.
Fire-damaged trusses replaced with engineered lumber matched to span.
We manage the timeline so it doesn't stall the project.
Installed to code once framing passes inspection.
Trim, doors, and cabinetry complete the rebuild's finished look.
You walk the finished property before we call it complete.
A technician answers and lines up a structural evaluation.
Initial framing and load evaluation included.
You approve the plan and permits before construction.
Nothing closes out until final inspection passes.
"The framing repair passed inspection on the first try, which our contractor friend said doesn't always happen." — Homeowner, Vado
"They handled all the permit scheduling with the city, which would've been a nightmare for us to manage." — Homeowner, Vado, NM
"The project stayed on the schedule they gave us at the start, which surprised us given the scope." — Homeowner, Vado
Yes, we coordinate all required permits with your local Vado office.
Timeline varies with damage extent.
Licensed to manage the complete construction process.
Significant damage typically gets engineer review first.
We provide the paperwork adjusters need.
We keep Vado rebuild projects on schedule by managing permitting directly.
